تسجيل الدخول للتقديم سجل و قدم |
---|---|---|
|
Consolidate the SKU wise demand for the next week to arrive at loading on each machine line
Finalize the schedulesequence on each production line basis of dispatch priorities and minimum changeoverdowntime requirements
Check RMPM availability for the above-mentioned schedule & rearrange the sequence product if there are any challenges
Ensure requisites of production (like manpower, project work, trials) on each line & incorporate the same in the schedule
Create Final Production batches in Oracle (through ASCP EBS)
Link the production batches with Sales order for specific printing instruction to appear on batch ticket
Update PE Date Lot numbers Barcode for all the Production batches
Analyze the Production Plan Compliance report of previous week & update the reasons for non-conformance in EBS to unit Supply chain
Understand, reflect & practice IFFCOs vision & values
Type:Company Job
Eligibility:Bachelor of Technology/Engineering .
Industry:FMCG / Foods / Beverages
Function:Production / Manufacturing
Deadline:13th Aug 2025
Production Scheduling