ATTACHMENT Ill TO SCHEDULE
Q
QUALITY
REQUIREMENTS FOR CONTRACTOR SUPPLIED MATERIALSQUALITY
REQUIREMENTS FOR CONTRACTOR SUPPLIED MATERIALS
PROCUREMENTPROCESS
CONTRACTOR shall provide and document
Quality services in the procurement
of equipment and material to be used
or installed during the construction and
installation of the facilities as
specified in the requirements of the Contract
11 Requisitions
CONTRACTOR shall not release
requisitions for purchase of equipment
or material prior to COMPANYs
approval of the Quality Plan unless
specifically approved in writing by
the Company Representative
12 Supplier and Sub-Supplier
Selection
121 Except as provided in Paragraph
126 of this Attachment Ill to
Schedule Q , for all
equipment and materials for which inspection
requirements are specified on SAUDI
ARAMCO in SAER 1972,
CONTRACTOR shall prequalify each
manufacturer and its
specific manufacturing site as
described in 122 through 125 of
this Attachment Ill Evidence of the
prequalification shall be
provided to COMPANY for its review and
concurrence at least two
weeks prior to placement of the
purchase order
122 CONTRACTOR shall evaluate
suppliers capabilities to meet the
technical, quality and schedule
requirements of the WORK Such
evaluation shall include technical
review of products to ensure
compliance with applicable COMPANY
standards Results of
such supplier evaluations shall be
subject to COMPANY approval
123 CONTRACTOR shall evaluate
suppliers Quality System, which
shall meet ISO 9001 system
requirements Reliance solely on
certification to ISO 9001 is
unacceptable CONTRACTORs prior
audits findings are considered current
if completed within 24-
months prior to the proposed equipment
purchase and do not
include any major technical or quality
deficiencies
124
CONTRACTOR shall complete a physical survey of proposed
suppliers
for any equipment requiring an inspection level of 2, 3,
or
4 as specified in SAER-1972 CONTRACTOR supplier
evaluations
shall, at a minimum, be carried out by a certified lead
auditor
per the requirements of Attachment I to this Schedule Q
and
a technical expert for the equipment under consideration
125 CONTRACTOR shall notify COMPANY
at least two weeks ahead
of all planned supplier surveys
126 Quality System evaluations are
not required for
a) Suppliers currently on the
Regulated Vendors List
referenced by Saudi Aramco Engineering
Standards; and
b) Suppliers currently listed on
COMPANYs list of
manufactures for lnspectable Items
The current versions of these lists
will be made available to
CONTRACTOR by COMPANY upon written
request from
CONTRACTOR to the Company
Representative
2 PROCUREMENT INFORMATION
21 CONTRACTOR shall review and ensure
the quality of all requisitions prior
to submittal for COMPANY review,
including all technical and quality
requirements specified in Schedule
G
22 CONTRACTOR shall review its
suppliers sub-orders to ensure that all
relevant COMPANY technical and
inspection requirements are passed on
to sub-suppliers
23 CONTRACTOR shall ensure that all
suppliers and manufacturers of
inspectable equipment and material
have and maintain acceptable Quality
programs in accordance with the
IS0-9001 quality standard
24 CONTRACTOR shall complete and
submit a weekly inspectionfabrication
status report to the Company Representative
in an electronic format
acceptable to COMPANY The report
shall include, as a minimum, the
following information for each
purchase order
241 Purchase Order Number (include
COMPANY Dummy PO
number) and Date
242 Material Description
243 Vendor Name and Location
244 Major Sub-vendor(s) Name and
Location
245 Inspection Assignment Package
submittal date as specified in
Paragraph 3151 of this Attachment
Ill
246 Level of Inspection as specified
in SAER-1972
247 Pre-inspection Meeting Date
248 Fabrication Start Date and
progress (percent complete) to date
inclusive of major suborders
249 Scheduled and Forecast Delivery
Date
241 0 Inspector and Agency
(qualified as specified in Attachment I of
Schedule Q )
2411 Special Process Procedures
(approved as specified in Paragraph
311 of this Attachment Ill)
2412 Open and Closed NCRs
2413 Closeout Date
2414 Disposition Report submittal
date
25 COMPANY shall have access to all
purchase order inspection report files
Contractor shall include a clause in
their Purchase Orders that COMPANY
(or their designee) has the right to
access manufacturers facilities and
suborder locations
3 VERIFICATION OF PURCHASED
MATERIALSEQUIPMENT
31 CONTRACTOR shall maintain an
effective system for continuity of order
identification that ensures drawings,
specifications, and inspection
requirements are properly transmitted
to suppliers at all tiers of order
placement
32 CONTRACTOR or its COMPANY approved
third party inspector shall
perform Quality activities at the
supplier and sub-supplier locations as
required by the applicable Form SA-175
and the inspection level assigned
for the materials and equipment
identified in SAER-1972 Inspection
Requirements Subject to COMPANY
approval, CONTRACTOR may
change the assigned level of
inspection during the course of the work as a
result of supplier performance
33 CONTRACTOR shall submit each week
a two-week look-ahead schedule
of all planned vendor inspections and
tests as specified in the approved
vendor I&TP per the applicable
SA-175 The schedule shall be sent
electronically in a format acceptable
to COMPANY
34 CONTRACTOR shall bring to the
attention of COMPANY any equipment
items not identified in SAER 1972 and
COMPANY shall assign the
appropriate inspection level
35 If CONTRACTOR delegates any
purchase of material to its
subcontractor(s), Inspection Levels in
SAER 1972 shall apply
CONTRACTOR is responsible that
Attachment Ill of this Schedule Q is
implemented and all documents are
reviewed by the CONTRACTOR prior
to the submittal for COMPANY review
36 When vendor performance does not
meet the specified requirements in
the purchase order, CONTRACTOR shall
increase the inspection level to
the next highest leve for the purchase
order without additional cost to
COMPANY
37 CONTRACTOR shall submit detailed
vendor(s) Inspection and Test Plans
(ITPs) in accordance with paragraph
310 of this Attachment for all
equipment and materials assigned a
level 2, 3, or 4 in SAER-1972, and for
any other equipment deemed necessary
by CONTRACTOR
38 CONTRACTOR shall review all
applicable COMPANY Quality
requirements and include appropriate
Quality requirements in the ITPs
Each ITP shall identify, as a minimum
the inspection level and detail all
witness, hold and certification review
points as specified in the COMPANY
Form175 (Inspection Requirements)
39 CONTRACTOR shall prepare a Special
SA Form 175 for approval by the
Company Representative
391 If no existing form 175 is
applicable to the equipment
392 For changes to the existing form
175
310 As a minimum, each vendor ITP
shall include the following information
31 01 Process description
31 02 Quality control requirements
31 03 Notification requirements for
supplier inspection witness and hold
points (minimum 5 working days)
31 04 Minimum Inspection Levels per
SAER-1972 andor Attachment VI
of this Schedule Q
31 05 Responsibility for
inspectiontest
31 06 Applicable procedures
31 0 7 Acceptance criteria (COMPANY
and International Industry
Standards)
31 08 Verifying documents
3109 Inspection points (Hold,
Witness & Review) by CONTRACTOR
31010 COMPANY Dummy PO number
31011 Reference to sub-supplier ITP
(as applicable)
311 When required by COMPANYs
standards, CONTRACTOR shall submit
for COMPANYs review and approval all
supplier procedures for refractory
installation, welding, welding repair,
heat treatment, and alloy verification
(PM I) as applicable, no later than 30
days prior to the start of the specific
work activity
312 Supplier and sub supplier
personnel for Positive Material Identification and
welding shall be qualified as
specified by COMPANYs Standards and
Attachment I of this Schedule
Q CONTRACTOR shall review and
approve such qualifications prior to
the start of manufacturing
313 The qualification and
certification of Nondestructive Testing (NOT)
personnel shall be in accordance with
a nationally recognized program as
listed in SAEP-1142 All suppliers
and sub suppliers NOT personnel
qualification and certification
programs as well as all NOT procedures shall
be reviewed against the International
and Company requirements and
approved by the Company approved
CONTRACTORs certified NOT
Level Ill prior to commencements of
any NOT operation Copies of
approved procedures shall be submitted
to COMPANY
314 CONTRACTOR shall make supplier
and sub-supplier NOT personnel
records and Welder Qualification
Records available to the Company
Representative on request
315 CONTRACTOR shall compile and
forward to the Company
Representative no later than
twenty-one (21) calendar days prior to the
pre-inspection meeting and start of
any fabrication, either at the prime
supplier or a major sub-supplier, one
electronic version on compact disc
(CD) of the CONTRACTORs Inspection Assignment
Package, and
forward to COMPANY one complete set
via e-mail For Inspection Level
1, CONTRACTOR shall submit the
Inspection Assignment Package
fourteen (14) days before final
inspection
Type:Company Job
Eligibility:High School or Equivalent, Diploma
Role:Other Marketing
Industry:Other
Function:Sales/ Business Development
Marketing & Communications
Deadline:07th Oct 2024
The independent ownership and management of CTSA has provided qualified consultingpersonnel to the Energy, Oil & Gas, Petrochemical, Utilities (Generation, Distribution, Treatment),Construction, and Offshore Industries for over nineteen years.CTSA is committed to providing the most efficient, reliable, and competent consulting services withtotal customer satisfaction remaining at the forefront of the CTSA mission. All CTSA personnel arerequired to fully understand the client’s needs and respond in a professionally competent andexpeditious manner. To assure and maintain competent consulting services, CTSA has an ongoingemphasis on upgrading personnel qualifications through training, continuing education,maintenance of current technical or industry certifications, and obtaining new certifications asmandated by client requirements.CTSA personnel work closely with the client’s management to assure that all project requirementsand objectives are met. CTSA personnel assure that the customer receives quality products thatare fit for purpose, reduce the risk of schedule delays, and cost overruns on multi-million dollarcapital equipment or refurbishment projects. With measurable results, our clients consistently useindependent inspection, expediting, quality control, engineering, and project managementconsulting services to achieve desired goals.